Began work on this Clinton Township, OH project in early August and completed in October 2020.
The 6,000 square foot project consisted of removal of the existing BUR roof system and installation of a new 2- ply Derbigum APP Modified Bitumen roof system over 1/16th” tapered insulation.
Additionally, Derbigum’s liquid-applied flashing was applied to the perimeter of the roof as well as new roof edge metal. At the front of the building, existing metal mansard panels were removed and replaced with new panels.