Happy Day School: Ravenna, OH
Completed in the summer of 2020, the 45,000 square foot project entailed a full tear-off and re-roof on approximately 10,000 square feet of the building and layover on top of the existing roof with a new Garland 2-ply Modified system on the remaining 35,000 square feet.
An asphalt and gravel flood coat was then applied over the entire roof for further protection. Additionally, mansard roofs around the building were enclosed with new 24-gauge Garland metal roof panels.